Saturday, November 13, 2021

Part III - At the same time...


I'm also trying to get the workshop set up. 

[*all pictures may be enlarged by clicking on them]

I've studded the back and side walls, insulated and covered that up using the plywood and OSB I'm removing from the walls inside the house.  The cupboards also came from inside the house.  For now I'm working via an extension cord from the house as we only have 100 amps.  I have contacted the electric company and they are moving forward on the request to bump that up to 200 amps.  Once that is in I'll have to connect all the wiring.

The lighting will likely come from the 5, 8' double fluorescent shop lights which currently decorate the ceiling of the kitchen, living, dining room areas!

We're currently also using the workshop to store some of the items that won't be unpacked until next spring summer...

Amidst this we are spending a lot of time in prayer for our immediate and extended family and their families some of whom are wrestling with some major life issues.  We invite you to join with us in those significant matters.

God IS good, ALL. THE. TIME.

No comments:

Post a Comment

Mostly, kinda', sorta'...

And the kitchen is mostly, kinda', sorta' done.  Battens have been cut, oiled and installed on the ceiling. The countertops arrived ...