And we have heat...

It took a couple of weeks, what with various emergency calls needing to be attended to and, well, that small 30" crawl space limiting the movement. but here she is in all her 60,000 BTU glory:


This is better than receiving a "special award" marked "Frajeelay."  Just look at that! Isn't she a beauty?

The best part of this are the two additional gas connections for
"wonder woman's" new stove and the soon to be installed washer dryer combo.  "Mr wonderful" just noticed that the stackable unit delivered last week, which has been waiting for installation, has an electric dryer instead of gas...so back on the phone to Lowe's.

In the meantime, I have re-situated the 100 lb propane tank over to the side of the shed.  The lp radiant heater for that is supposed to arrive this week, and then work can really begin.  

Plans are to finish the mechanical room with 7/16's OSB for the walls and 1x6 pine planking for the floor.  And then to plumb and install the washer dryer unit and reinstall the commode, so... stay tuned.



Mostly, kinda', sorta'...