Saturday, November 13, 2021

Part III - At the same time...


I'm also trying to get the workshop set up. 

[*all pictures may be enlarged by clicking on them]

I've studded the back and side walls, insulated and covered that up using the plywood and OSB I'm removing from the walls inside the house.  The cupboards also came from inside the house.  For now I'm working via an extension cord from the house as we only have 100 amps.  I have contacted the electric company and they are moving forward on the request to bump that up to 200 amps.  Once that is in I'll have to connect all the wiring.

The lighting will likely come from the 5, 8' double fluorescent shop lights which currently decorate the ceiling of the kitchen, living, dining room areas!

We're currently also using the workshop to store some of the items that won't be unpacked until next spring summer...

Amidst this we are spending a lot of time in prayer for our immediate and extended family and their families some of whom are wrestling with some major life issues.  We invite you to join with us in those significant matters.

God IS good, ALL. THE. TIME.

Thursday, November 11, 2021

Part II - Along the Way...

The past month has seen more than it's share of personal challenges but God has provided encouragement along the way with His grace being sufficient in every way.  Soli Deo Gloria!

We've finished up the Master Bedroom with the exception of replacing the window and hanging the closet doors.  An 11' cedar closet and carpeting along with some touch up painting was the focus here. The window replacement may need to wait until spring at this point.  And the latter will depend upon my ability to secure decent lumber.  (Finding good quality, well-planed, straight, AND affordable lumber is a still a challenge.  Fortunately we have connected with a family-owned lumber yard that is serious about their business.)


   This...                                        to this...                              to this...and

We've also finished most of the work in the Guest Bedroom with the window replacement being the exception in this room as well. (We're planning to replace the furniture and orient the room toward a play room for grandchildren after the holidays.) 

 

   This...                                      to this...                       to this...

 

And we've started on the hallway.  

All of this is most immediately oriented toward entertaining family for Thanksgiving. Our son and daughter-in-law and two granddaughters will be back in the country for the holidays and we're excited about being able to host them.

In the meantime we're continuing to unpack, place, and packaway the household items we brought with us from NC, insulating the workshop, covering those walls, and putting away tools.

in all of this we are thankful for the deer and deer that parade around, the mountains and the autumn beauty...Soli Deo Gloria!

***pictures may be enlarged by clicking on them



 


Tuesday, October 12, 2021

Part I – The beginning...

So we closed on the Snake Pit Rod and Gun Club property and began a new chapter in our storied lives, on 4 acres between Keeneyville and Shortsville. On a "good day" I can sometimes get a signal on my Trac phone at the corner of the front porch. The nearest Verizon signal is about 6 miles away. No land line phone, no internet, just the beauty of God's created order...

The cabin is, well, some of you have seen pictures, rustic as most hunting clubs are in north-central PA.

The inside has one layer of rigid foam board insulation and is otherwise ready for wall coverings, although we will add another layer of insulation prior to covering them.

It boasts a bunk room (with  four built in 2x6 beds three of which are bunks) and a second smaller bedroom, a large bathroom with a second toilet in the utility room, and a very large (900 sq foot) open concept kitchen-living-dining space.  There is a wood stove to heat the entire house and a spring fed, hand dug well for water. 


It took a couple of days of strenuous work tearing out the built-in bedframes piling up the mattresses and otherwise clearing out the bunk room which will become the Master Bedroom. Some of the lumber was salvageable... but those screws...well over 100 per bunk...I counted...

The plans are to use pine tongue and groove pretty much throughout the house, with a some accent walls strategically placed to break up the monotony. So a trip to town was made, an order placed, and the first lumber delivery would happen before the work could actually begin.

In the meantime we had to empty the fully furnished cabin.  Our son, Caleb, took the sectional couch and the once decent Lazy Boy.  So we still had the vibrating Lazy Boy, another couch, a couple of chairs, 7 bed mattresses, and a kitchen table and chairs that had seen too many better days, in addition to all sorts of smaller well worn items.  We filled a 15' Uhaul truck and hauled off 1539 lbs worth of dump worthy items.  

This first week we also replaced the hot water heater, made numerous calls trying to get a phone line and or internet (unsuccesfully), and took delivery of 128 cubic feet of wood (3 full cords) for the winter heating season, hoping it would be enough.  My lovely and incredibly fit wife was eager to help pile the wood. As we did this I remembered well, my dad saying to me that wood normally warmed you at least two times, once when you stacked it and the other when you burnt it.  (Fortunately we didn't have to cut and split it this year!)

We ended the week by taking delivery of the first order of lumber and getting to work on revealing the promising future.


 
We received the second order of lumber the second week and have finished up most of the rough construction in the Master bedroom.  Just a bit more finish/trim work to do, a ceiling to be pained, cedar to be installed in the closet and some doors to be hung, but progress is notable.
 
As if all of this wasn’t encouraging enough, the garden tractor arrived...John Deere X580. I immediately set off to conquer the acre and a half or so of lawn. We still have another ¾ of an acre that will need to be brush hogged but I was one happy camper. AND we were finally able to schedule an internet connection (HughesNet) and telephone installation.
 
As we begin our third full week we are thankful. This morning four gobbler's were on full display, strutting, trying to win the affections of any of a dozen or more hens while deer grazed in the background on the hillside across from the front porch while fresh bear skat occupied a placed just inside the edge of the wooded acreage behind the horse barn. 
 
We’ll be on the road back to NC later this next week. I’ll be preaching at the Jonesboro Heights Baptist Church on the 17th, and we’ll have the opportunity to visit with much missed friends and check in on Carol’s
folks. We'll also load the final U-Haul with all of my shop materials. (My shop arrives on the 26th of Oct.   


 
And God's grace continues to rain down upon us. His faithfulness has been abundantly evident!

Th-th-th-that’s all for now folks.

 

Wednesday, September 22, 2021

And now to the out of doors...

It has obviously been too long since I updated, but we have not been lethargic. Now that the inside is pretty much completed (I mean is anyt...